Project target

Replace the old stream, where water kept overflowing, with a wider and higher stream (including two barrages).

Initial situation

The old stream in mid-August 2023

alter bachlauf

New stream – first milestone

We had completely removed the old stream and remodeled the new stream with soil and sand.

For the two barrages we had used granite stones about 15 cm high and placed the pond fleece and the pond liner on top.

Here the first result, after we had put the stones (Ticino river stones, Netstal stones and stones from the surroundings) again (at least times provisionally):

The first resident

A newt is clearly enjoying the new stream.

Share This Story, Choose Your Platform!

Leave A Comment

How the biotope has developed
wildstauden"Flower meadow" replaced by wild shrubs